Complete refurbishment of property. 9 week turnaround which was very challenging, but came in ON TIME and ON BUDGET! Installation of :-
- New comprehensive CCTV system, comprising of POE (Power Over Ethernet) 32 Channel Full HD main switch. Including 4TB surveillance hard disk drive. 21 8MP Full HD cameras installed. System also future proofed for expansion.
- New Fire Alarm and Detection system. 2 Loop 32 Zone Addressable Fire Panel, with investigation delay, day / night occupancy. All comprising to Specification to BS 5839-1: 2017 Fire detection and alarm systems for buildings – Part 1: Code of practice for the design, installation, commissioning and maintenance.
- Installation of comprehensive data network. For current use, plus future proving system.
- Bespoke containment installed. Capacity for all clients needs, also future proving installation for ease of works and networking.